Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Union Issues
after Christmas preload changes
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="konsole" data-source="post: 636192" data-attributes="member: 23965"><p>I heard from the grapevine that this might happen, no guarantees yet though and it sounds like something that was just mentioned as a possibility to PT sups. Not sure if this is specific to our building or some or all or what. I heard that after Christmas the start time for the preload could be pushed back about an hour and the preloaders will go from loading 3 trucks to 4. I assume this would mean that 1 out of every 3/4 preloaders will be let go since 3 people will then be doing the work of 4 people. So that would mean 1 or 2 people per belt let go. This past year preloaders at our building did 3 trucks in 3.5 hours so 70 minutes each, but an extra hour woud only mean this 4th truck would only get 60 minutes to load. Has anyone else heard anything about this?</p></blockquote><p></p>
[QUOTE="konsole, post: 636192, member: 23965"] I heard from the grapevine that this might happen, no guarantees yet though and it sounds like something that was just mentioned as a possibility to PT sups. Not sure if this is specific to our building or some or all or what. I heard that after Christmas the start time for the preload could be pushed back about an hour and the preloaders will go from loading 3 trucks to 4. I assume this would mean that 1 out of every 3/4 preloaders will be let go since 3 people will then be doing the work of 4 people. So that would mean 1 or 2 people per belt let go. This past year preloaders at our building did 3 trucks in 3.5 hours so 70 minutes each, but an extra hour woud only mean this 4th truck would only get 60 minutes to load. Has anyone else heard anything about this? [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Union Issues
after Christmas preload changes
Top