OptimusPrime
Well-Known Member
During our PCM they said our build was 326,000 over planned. Over 500 late air. I was one of the first to leave, and I left the building at 9:50. Load was blown out, but wasn't really done, I just had to get out of the way. Left with around 240 stops. Was helping the driver being loaded next to me. Was supposed to leave with over 400 stops. We just ended up having to snatch off the 7000 and 8000 section to be left behind. Was told to just bring back whatever was left to keep it under 12. Around 8:20, the center manager called a truce and just told everyone to comeback with whatever they had left. Should be a fun one tomorrow. Though if we are going to be keeping it under 12, least you can see the light at the end of the day.