Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
UPS Subsidiaries
UPS Information Technology
IT Layoffs
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="copper" data-source="post: 582216" data-attributes="member: 24398"><p>There are a few projects in Louisville that are already on that path. They came from a level 5 CMM and an ISO-9001 certified industrial facilities. This is one of the largest reasons they are square pegs. They did not come from operations and have regularly been told they know nothing about the business because they have never touched a package. This is a snotty attitude to express toward career long professional developers. They won't be around long because there are greener pastures for them because they have real skills but have long been trashed on their QPR's because of their lack of UPSishness and failure to comply to the <em><strong>lackadaisical </strong></em>methods and structure typical of UPS ex-ops.</p></blockquote><p></p>
[QUOTE="copper, post: 582216, member: 24398"] There are a few projects in Louisville that are already on that path. They came from a level 5 CMM and an ISO-9001 certified industrial facilities. This is one of the largest reasons they are square pegs. They did not come from operations and have regularly been told they know nothing about the business because they have never touched a package. This is a snotty attitude to express toward career long professional developers. They won't be around long because there are greener pastures for them because they have real skills but have long been trashed on their QPR's because of their lack of UPSishness and failure to comply to the [I][B]lackadaisical [/B][/I]methods and structure typical of UPS ex-ops. [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
UPS Subsidiaries
UPS Information Technology
IT Layoffs
Top