Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Partners
More Admin jobs going away, what's next?
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="elo" data-source="post: 5229532" data-attributes="member: 50549"><p>I hate the PDOP. Our PDOP doesn’t even match our building layout. It doesn’t factor in our clerk & surepost as non load positions. The clerk PPH is something like 3500 & our surepost position is considered a load positions. Roughly 10% of our volume goes to surepost T-friend, M-friend that position handles holds, data acq, & DELVs. Our building set up is garbage in PDOP & no one will fix it. I’ve sent a building schematic to 5 different people to get it changed. So nothing realistic goes into it. I plan the preload with an excel sheet I made 5 years ago. Enter the planned pph, volume, & number of ppl working. I base the whole thing off of the unload flow. We make plan. It’s the craziest thing that a straight line belt doesn’t need PDOP.</p></blockquote><p></p>
[QUOTE="elo, post: 5229532, member: 50549"] I hate the PDOP. Our PDOP doesn’t even match our building layout. It doesn’t factor in our clerk & surepost as non load positions. The clerk PPH is something like 3500 & our surepost position is considered a load positions. Roughly 10% of our volume goes to surepost T-friend, M-friend that position handles holds, data acq, & DELVs. Our building set up is garbage in PDOP & no one will fix it. I’ve sent a building schematic to 5 different people to get it changed. So nothing realistic goes into it. I plan the preload with an excel sheet I made 5 years ago. Enter the planned pph, volume, & number of ppl working. I base the whole thing off of the unload flow. We make plan. It’s the craziest thing that a straight line belt doesn’t need PDOP. [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Partners
More Admin jobs going away, what's next?
Top