Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Union Issues
Onroad Supe seems to resent the union
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Nose to the Grindstone" data-source="post: 3355362" data-attributes="member: 71050"><p>In an effort to eliminate his ability to accuse me of running up miles, I decided to follow Orion religiously since our EDD list will be gone very soon anyway.</p><p></p><p>I gave Orion a good shot, but I was faced with searching for certain packages in a crowded mess of a load. Needless to say, my overallowed skyrocketed due to all of the digging and searching. I'm sure the supe would be happy to go back to me just running an hour overallowed with a 12 hour planned day.</p><p></p><p>The Orion reduced the miles by less than 10% and added at least 60 minutes of digging and searching.</p><p></p><p>I have used Orion on a Saturday (50 pieces), and it's a hero. In a package car stuffed full of packages, Orion seems like an attempt at sabotage. How clueless do you have to be to keep this program alive? Don't these people who make these decisions ever go out on a route and try to use Orion in the stuffed package cars with the loads we get? I seriously wonder if these people aren't shorting the UPS stock.</p><p></p><p>Regarding the time study, I have to think that the time study was not made on a 12 hour planned day. Having 50% more pieces jammed in there makes it so much harder to find the packages.</p></blockquote><p></p>
[QUOTE="Nose to the Grindstone, post: 3355362, member: 71050"] In an effort to eliminate his ability to accuse me of running up miles, I decided to follow Orion religiously since our EDD list will be gone very soon anyway. I gave Orion a good shot, but I was faced with searching for certain packages in a crowded mess of a load. Needless to say, my overallowed skyrocketed due to all of the digging and searching. I'm sure the supe would be happy to go back to me just running an hour overallowed with a 12 hour planned day. The Orion reduced the miles by less than 10% and added at least 60 minutes of digging and searching. I have used Orion on a Saturday (50 pieces), and it's a hero. In a package car stuffed full of packages, Orion seems like an attempt at sabotage. How clueless do you have to be to keep this program alive? Don't these people who make these decisions ever go out on a route and try to use Orion in the stuffed package cars with the loads we get? I seriously wonder if these people aren't shorting the UPS stock. Regarding the time study, I have to think that the time study was not made on a 12 hour planned day. Having 50% more pieces jammed in there makes it so much harder to find the packages. [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Union Issues
Onroad Supe seems to resent the union
Top