How UPS is improving on-time efficiency with EcoStruxure™ connected solutions

cheryl

I started this.
Staff member
How UPS is improving on-time efficiency with EcoStruxure™ connected solutions - Logistics Management

Find out how the new UPS Smart Hub facility is capable of processing 104,000 packages per hour with the latest automation technology.

On the outskirts of Atlanta, Georgia, UPS is building an industry-leading Smart Hub capable of handling 104,000 packages per hour. It’s a game-changing facility, loaded with the kind of technology and capabilities that can affect how the entire shipping industry operates. And what is driving the need for this massive build-out? The rapid and ongoing rise of digital demand.

“The growth of digital demand in shipping and e-commerce has given us a variation in package mix, package size, delivery demands, and customer expectations that did not exist just a few years ago,” said Joel Stenson, Vice President of Corporate Plant Engineering at UPS. “It tells us that the market is changing, and we are changing right along with it.”
 
Top