Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
new 1 for 4000 goal for missorts!!
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="soberups" data-source="post: 674528" data-attributes="member: 14668"><p>It can be hard to take pride in your work when you are set up to fail by your management.</p><p> </p><p>The MDU where my route is loaded is undersized and overcrowded. Plant engineering jury-rigged a conveyor belt out thru a hole cut in a wall, and the opening is poorly designed which leads to constant jams.</p><p> </p><p>There arent any stack tables. Bulk stops just pile up on the floor and the preloaders often have to crawl over the packages to get from one car to the next.The roof and doors leak, causing the floor and all of the packages to get wet when it rains.</p><p> </p><p>Management has <em>no intention</em> of ever solving these underlying problems...yet they are more than willing to scream at people for shutting off the belt to manage flow, or threaten discipline for misloads at the same time they are yelling at everyone to "wrap up and get off the clock".</p><p> </p><p>There are no "bad" preloaders.... only bad preload managers and incompetent plant engineers.</p></blockquote><p></p>
[QUOTE="soberups, post: 674528, member: 14668"] It can be hard to take pride in your work when you are set up to fail by your management. The MDU where my route is loaded is undersized and overcrowded. Plant engineering jury-rigged a conveyor belt out thru a hole cut in a wall, and the opening is poorly designed which leads to constant jams. There arent any stack tables. Bulk stops just pile up on the floor and the preloaders often have to crawl over the packages to get from one car to the next.The roof and doors leak, causing the floor and all of the packages to get wet when it rains. Management has [I]no intention[/I] of ever solving these underlying problems...yet they are more than willing to scream at people for shutting off the belt to manage flow, or threaten discipline for misloads at the same time they are yelling at everyone to "wrap up and get off the clock". There are no "bad" preloaders.... only bad preload managers and incompetent plant engineers. [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
new 1 for 4000 goal for missorts!!
Top