Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Taking RPCD's work; 22.4's forced to work Mondays for the duration of peak.
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="browned out" data-source="post: 4637691" data-attributes="member: 8105"><p>Tuesday to Friday. Yes. RPCD guarantee is 8 hours.</p><p></p><p>Monday, absolutely not if a 22.4 is working. Extra work is afforded in accordance to the contract. 22.4s are not the same classification as RPCDs. 22.4s are scheduled to work Tuesday to Saturday or Wednesday to Sunday.</p><p></p><p> The Company may create full-time <strong>22.4 combination</strong> driving jobs. Such jobs may include inside work. In the event the Company utilizes <strong>this classification, ..... </strong>All 22.4 combination drivers shall work a five (5) consecutive day schedule of <strong>Tuesday through Saturday or Wednesday through Sunday. This paragraph shall supersede any Supplement, Rider, or Addendum on the same subject. </strong> 4. No RPCD shall be laid off or <strong>displaced from the classification while 22.4 combination drivers are working in the building. </strong></p><p><strong></strong></p><p><strong>Section 16—Extra Work Seniority shall prevail for extra work and the work shall be assigned by seniority, within the classification.</strong></p><p></p><p>Please enlighten me how the Monday Extra Work is not rightfully the RPCDs. Or make something up. lol</p></blockquote><p></p>
[QUOTE="browned out, post: 4637691, member: 8105"] Tuesday to Friday. Yes. RPCD guarantee is 8 hours. Monday, absolutely not if a 22.4 is working. Extra work is afforded in accordance to the contract. 22.4s are not the same classification as RPCDs. 22.4s are scheduled to work Tuesday to Saturday or Wednesday to Sunday. The Company may create full-time [B]22.4 combination[/B] driving jobs. Such jobs may include inside work. In the event the Company utilizes [B]this classification, ..... [/B]All 22.4 combination drivers shall work a five (5) consecutive day schedule of [B]Tuesday through Saturday or Wednesday through Sunday. This paragraph shall supersede any Supplement, Rider, or Addendum on the same subject. [/B] 4. No RPCD shall be laid off or [B]displaced from the classification while 22.4 combination drivers are working in the building. Section 16—Extra Work Seniority shall prevail for extra work and the work shall be assigned by seniority, within the classification.[/B] Please enlighten me how the Monday Extra Work is not rightfully the RPCDs. Or make something up. lol [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Taking RPCD's work; 22.4's forced to work Mondays for the duration of peak.
Top