Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Tired of delivering Pottery Barn boxes
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="dave_socal" data-source="post: 207365" data-attributes="member: 5582"><p>I agree with your vaild points. In general our system of buildings, trucks, conveyer belts, irreg carts, platform for loading etc.. has not been kept updated enough to handle this account and others like it. I mean the irregs in the morning alone are a complete mess in my building not to mention the pass system and the dispatch by computer joke that has become of most centers. We choke on COSTCO tires and FRONTGATE is another account that slows up our preload. Our trucks are about 2 inches apart, I have to climb through two other cabs just two get in my package car or walk about 40 yards around and up on the belt climbing over the preloaders work to go in the back. Why because they stack package cars tight just to put all these irregs close to the belts. I'm not bitchin about the work! Just give us the right tools for the job and half a chance to get out of the building on time. Hell, our hand trucks/dollys are cheaper and smaller than they used to be. We all go above and beyond what is needed to overcome these oversized obstacles because that is what we are faced with but I wonder how much better we could do with newer buildings and equipment.</p></blockquote><p></p>
[QUOTE="dave_socal, post: 207365, member: 5582"] I agree with your vaild points. In general our system of buildings, trucks, conveyer belts, irreg carts, platform for loading etc.. has not been kept updated enough to handle this account and others like it. I mean the irregs in the morning alone are a complete mess in my building not to mention the pass system and the dispatch by computer joke that has become of most centers. We choke on COSTCO tires and FRONTGATE is another account that slows up our preload. Our trucks are about 2 inches apart, I have to climb through two other cabs just two get in my package car or walk about 40 yards around and up on the belt climbing over the preloaders work to go in the back. Why because they stack package cars tight just to put all these irregs close to the belts. I'm not bitchin about the work! Just give us the right tools for the job and half a chance to get out of the building on time. Hell, our hand trucks/dollys are cheaper and smaller than they used to be. We all go above and beyond what is needed to overcome these oversized obstacles because that is what we are faced with but I wonder how much better we could do with newer buildings and equipment. [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Tired of delivering Pottery Barn boxes
Top