Ask your BA or steward about it. I have had a steward force a route bid. I did not sign it and that was not the point. The point was that it was in all the time, the 1st 3-4 sections were always the same (2 industrial parks), the resis changed frequently. center manager tried to say that because it changed so often, it did not have to be bid. Push came to shove and it was bid.
It is the kind of thing that is very easy for cut drivers to see, but harder for a bid route holder (we have 2 stewards, both have their own routes) to see.