Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Union Issues
Center manager wants me to run scratch or 30 in the box
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Gotout" data-source="post: 2193054" data-attributes="member: 63049"><p>5 rides in 3 weeks is over-supervision and a violation of article 37.</p><p>Adding "communication time" to your ojs ride will likely invalidate the ride in the eyes of a panel. Be sure to have a steward put in a formal request for the "GTS edit log with original and changes" for every day they ride with you. This will show them adding various codes to you ripe card that will impact your planned day.</p><p>Discipline for priduction doesn't hold up at a panel, but discipline for methods infractions does. If you look at your Diad after stopping, but before getting out of your seat, here's a WL for not following the "stop car routine" method. If you look after your Diad after getting back to the car, here's a WL for "move out without delay". The up side is that most on-cars these days don't have the methods knowledge to build a case against you like that.</p><p>The next thing they will do is come after you of safety, which is easier.</p><p>I agree on the suggestions about the 9.5 list and 8 hour requests. File on everything. When your center manager pulls you aside and asks why your filing all the grievances, tell him you really just want to be left alone. He has neither the time or energy to deal with you.</p><p></p><p>But why listen to me, I GotOut</p></blockquote><p></p>
[QUOTE="Gotout, post: 2193054, member: 63049"] 5 rides in 3 weeks is over-supervision and a violation of article 37. Adding "communication time" to your ojs ride will likely invalidate the ride in the eyes of a panel. Be sure to have a steward put in a formal request for the "GTS edit log with original and changes" for every day they ride with you. This will show them adding various codes to you ripe card that will impact your planned day. Discipline for priduction doesn't hold up at a panel, but discipline for methods infractions does. If you look at your Diad after stopping, but before getting out of your seat, here's a WL for not following the "stop car routine" method. If you look after your Diad after getting back to the car, here's a WL for "move out without delay". The up side is that most on-cars these days don't have the methods knowledge to build a case against you like that. The next thing they will do is come after you of safety, which is easier. I agree on the suggestions about the 9.5 list and 8 hour requests. File on everything. When your center manager pulls you aside and asks why your filing all the grievances, tell him you really just want to be left alone. He has neither the time or energy to deal with you. But why listen to me, I GotOut [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Union Issues
Center manager wants me to run scratch or 30 in the box
Top