Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Flow Count~..!?
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="trplnkl" data-source="post: 390335" data-attributes="member: 13254"><p>I must apologize Drewed, I misread what you had typed. When you said "<em>employee B should be doing something different</em>"</p><p> I read that as <em>different</em> in work methods or speed not as another assignment/duty.</p><p> Now when you followed with."<em> UPS does have standard of work where in no way should it take more than that amount </em></p><p><em>exp it shouldnt take longer than an hour to either upload or download a plane if it takes longer than said amount, theres a issue with the work itself that is being done"</em></p><p><em></em> I took that to mean (again) with the unload methods and speed more than the type, size and weight of packages. I don't advocate that the employees be allowed to piddle around and mosey through the shift doing as little work as possible, but I sure don't think it's right to stand over them cracking a whip hollering " faster you fool, faster".</p><p> Sorry <img src="/community/styles/default/xenforo/smilies/FeltTip/peaceful.png" class="smilie" loading="lazy" alt=":peaceful:" title="Peaceful :peaceful:" data-shortname=":peaceful:" /></p></blockquote><p></p>
[QUOTE="trplnkl, post: 390335, member: 13254"] I must apologize Drewed, I misread what you had typed. When you said "[I]employee B should be doing something different[/I]" I read that as [I]different[/I] in work methods or speed not as another assignment/duty. Now when you followed with."[I] UPS does have standard of work where in no way should it take more than that amount exp it shouldnt take longer than an hour to either upload or download a plane if it takes longer than said amount, theres a issue with the work itself that is being done" [/I] I took that to mean (again) with the unload methods and speed more than the type, size and weight of packages. I don't advocate that the employees be allowed to piddle around and mosey through the shift doing as little work as possible, but I sure don't think it's right to stand over them cracking a whip hollering " faster you fool, faster". Sorry :peaceful: [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Flow Count~..!?
Top