Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Piece rate for pre-loaders
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="TechGrrl" data-source="post: 1029099" data-attributes="member: 4932"><p>Industrial Engineering, the efficiency experts that set up the work processes and analyze what the productivity pieces per hour should be for all the jobs. In manufacturing factories, statistical process control is used to set up quality and productivity metrics. At UPS, the inside jobs like hub and preload, have similar analyses done, by the IE department.</p><p></p><p>However, it has been my observation (somewhat at second hand since I retired 5 years ago) that the IE function at UPS has taken a drastic downhill slide in recent years, and is more dependent on computer spreadsheets than on actually going into the operation to observe and make recommendations while working with the actual, you know, operators.</p></blockquote><p></p>
[QUOTE="TechGrrl, post: 1029099, member: 4932"] Industrial Engineering, the efficiency experts that set up the work processes and analyze what the productivity pieces per hour should be for all the jobs. In manufacturing factories, statistical process control is used to set up quality and productivity metrics. At UPS, the inside jobs like hub and preload, have similar analyses done, by the IE department. However, it has been my observation (somewhat at second hand since I retired 5 years ago) that the IE function at UPS has taken a drastic downhill slide in recent years, and is more dependent on computer spreadsheets than on actually going into the operation to observe and make recommendations while working with the actual, you know, operators. [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Piece rate for pre-loaders
Top