extranatty
Well-Known Member
In case anyone is interested...
After searching for it on satellite I went out to the construction site for the new hub. I walked inside and harassed the construction workers. The building is massive, at least 300 doors. They have about a dozen conveyor belts tucked in one corner of it but 90% of it is empty. It has air conditioning and they need 1500 employees, especially drivers.
There's no way this building is operating beyond 10% of capacity in time for peak but it doesn't really need any more. It has miles on 3 sides for expansion and it's connected to loop 303. I'm hoping to transfer. It's across the highway from Dick's Distribution Center
After searching for it on satellite I went out to the construction site for the new hub. I walked inside and harassed the construction workers. The building is massive, at least 300 doors. They have about a dozen conveyor belts tucked in one corner of it but 90% of it is empty. It has air conditioning and they need 1500 employees, especially drivers.
There's no way this building is operating beyond 10% of capacity in time for peak but it doesn't really need any more. It has miles on 3 sides for expansion and it's connected to loop 303. I'm hoping to transfer. It's across the highway from Dick's Distribution Center