Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Union Issues
Unfair Production Standards
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="tourists24" data-source="post: 836648" data-attributes="member: 11490"><p>Not in the way you are thinking... no its not.... IE puts out the "way it is to be done"..... Center level mgt has to make those reports look good and when they dont have to answer for it...</p><p> </p><p>Operations uses any manipulation of a "fair days work" they can get to make the SPORH look good. Massaging loads...? no? loading up with stop heavy areas? no? running up miles? no? Something inaccurate?</p><p> </p><p>Only speaking for my area, management likes to load up an area during a 3 day ride with as wide variety of dispatches as they can get for those 3 day (ie... no 3 days are the same), but stack it so the SPORH is as high as it can.... the route never is the same twice. Why dont they just keep it the same and get an accurate SPORH?</p></blockquote><p></p>
[QUOTE="tourists24, post: 836648, member: 11490"] Not in the way you are thinking... no its not.... IE puts out the "way it is to be done"..... Center level mgt has to make those reports look good and when they dont have to answer for it... Operations uses any manipulation of a "fair days work" they can get to make the SPORH look good. Massaging loads...? no? loading up with stop heavy areas? no? running up miles? no? Something inaccurate? Only speaking for my area, management likes to load up an area during a 3 day ride with as wide variety of dispatches as they can get for those 3 day (ie... no 3 days are the same), but stack it so the SPORH is as high as it can.... the route never is the same twice. Why dont they just keep it the same and get an accurate SPORH? [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Union Issues
Unfair Production Standards
Top