I heard from the grapevine that this might happen, no guarantees yet though and it sounds like something that was just mentioned as a possibility to PT sups. Not sure if this is specific to our building or some or all or what. I heard that after Christmas the start time for the preload could be pushed back about an hour and the preloaders will go from loading 3 trucks to 4. I assume this would mean that 1 out of every 3/4 preloaders will be let go since 3 people will then be doing the work of 4 people. So that would mean 1 or 2 people per belt let go. This past year preloaders at our building did 3 trucks in 3.5 hours so 70 minutes each, but an extra hour woud only mean this 4th truck would only get 60 minutes to load. Has anyone else heard anything about this?