Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Plant Engineering with Integrity
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="PeakMode" data-source="post: 3777088" data-attributes="member: 73648"><p>When ask to do something. PE does it. I have a positive experience with PE when I was a Preload CHSP Co Chair. To sum it it up, it just a sheer lack of communication between operations and PE. </p><p></p><p>Ex: Alot of times, the daily check sheet PT Sup are supposed to submit to PE does not get done. In turn I see PE walk around the building and walk past simple issues that could be corrected in 5 mins. </p><p></p><p>When you have building of folks who dont have to answer to maybe 0 to 1 person within a building then you get alot of finger pointing with nothing being done.</p></blockquote><p></p>
[QUOTE="PeakMode, post: 3777088, member: 73648"] When ask to do something. PE does it. I have a positive experience with PE when I was a Preload CHSP Co Chair. To sum it it up, it just a sheer lack of communication between operations and PE. Ex: Alot of times, the daily check sheet PT Sup are supposed to submit to PE does not get done. In turn I see PE walk around the building and walk past simple issues that could be corrected in 5 mins. When you have building of folks who dont have to answer to maybe 0 to 1 person within a building then you get alot of finger pointing with nothing being done. [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Plant Engineering with Integrity
Top