Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Twilight Hub making severe cuts
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="blue efficacy" data-source="post: 489459" data-attributes="member: 6435"><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'">The twilight sort at my building is facing severe cutbacks. My building has 3 secondary slides as well as five "Primary Direct" belts. One of each is scheduled to be closed very soon.</span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'">Our hub has been down in volume but I did not see anything this drastic coming. One of the PD's closing, sure, but to lose a secondary is a big deal.</span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'">The secondary belt in question also handles all of the local volume for the Preload. So this will entail the loss of a position for a boxline sorter for each of the four centers as well. The sorters on that aisle are all quite high seniority, including one non-22.3 Full Timer and I am guessing some of them may be stuck loading!</span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'">I imagine the plan is to put all of the local preload volume into trailers to be unloaded later.</span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'">Things are getting bad, and fast. I imagine some poor new kids will soon be told their services are no longer needed at the company.</span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'">Needless to say, I shall soon halt tolerating supervisors working in ANY form.</span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p><p><span style="font-size: 15px"><span style="color: Purple"><span style="font-family: 'Century Gothic'"></span></span></span></p></blockquote><p></p>
[QUOTE="blue efficacy, post: 489459, member: 6435"] [SIZE=4][COLOR=Purple][FONT=Century Gothic]The twilight sort at my building is facing severe cutbacks. My building has 3 secondary slides as well as five "Primary Direct" belts. One of each is scheduled to be closed very soon. Our hub has been down in volume but I did not see anything this drastic coming. One of the PD's closing, sure, but to lose a secondary is a big deal. The secondary belt in question also handles all of the local volume for the Preload. So this will entail the loss of a position for a boxline sorter for each of the four centers as well. The sorters on that aisle are all quite high seniority, including one non-22.3 Full Timer and I am guessing some of them may be stuck loading! I imagine the plan is to put all of the local preload volume into trailers to be unloaded later. Things are getting bad, and fast. I imagine some poor new kids will soon be told their services are no longer needed at the company. Needless to say, I shall soon halt tolerating supervisors working in ANY form. [/FONT][/COLOR][/SIZE] [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
Twilight Hub making severe cuts
Top