Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
whats the best way to deal with this new "push" on production? on production.
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="toonertoo" data-source="post: 510390" data-attributes="member: 1944"><p>Im having the same problem with my EDD. I have now been told that aprrox 15 places I need to deliver before 12, and I run air til 1030. Ive already blown my 20% allowance, and now they want to push me without saying it to skip my lunch. I cant make time and by the time I can it is pu time, then its balls to the wall to get in by air time. I asked them to put them all in the board that way, so I dont get gigged. And they ask why cant I just do what my customers need. Well I can, but then I get gigged, why cant you just put those 15 in after my air. Well that wouldnt follow Pas. Yes, no *****. I pull all over. Anymore instead of doing what I need to do I <strong>almost </strong>find myself trying to fix my board so I wont get gigged. The brainwash is almost complete. I no longer can think on my own. What a joke</p></blockquote><p></p>
[QUOTE="toonertoo, post: 510390, member: 1944"] Im having the same problem with my EDD. I have now been told that aprrox 15 places I need to deliver before 12, and I run air til 1030. Ive already blown my 20% allowance, and now they want to push me without saying it to skip my lunch. I cant make time and by the time I can it is pu time, then its balls to the wall to get in by air time. I asked them to put them all in the board that way, so I dont get gigged. And they ask why cant I just do what my customers need. Well I can, but then I get gigged, why cant you just put those 15 in after my air. Well that wouldnt follow Pas. Yes, no *****. I pull all over. Anymore instead of doing what I need to do I [B]almost [/B]find myself trying to fix my board so I wont get gigged. The brainwash is almost complete. I no longer can think on my own. What a joke [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Brown Cafe UPS Forum
UPS Discussions
whats the best way to deal with this new "push" on production? on production.
Top