how does something like this work? Ours (WORMA) takes about 5.5 hours on average (but 4.5 for some). Just use less workers to load more cars? I'm curious.1
I'm full time night-preload, start at 11:15 p.m., work till 8:a.m. Thought I'd hate it, but I love it. first half of shift on slides, second half spa-scanning.
There are several possibilities, had combo job that was supposed to be pre-load sorter / air driver, but they never had any extra air to deliver so they changed it to full-time box-line sorter working the midnight/pre-load. Need to read description on bid and start time, and doesn't hurt to verify what you would be doing.