Agreed but to continue to have flights scheduled to go to Memphis, after the first day weather shut the city down, plans should have been in place to have volume move through either another hub or have it moved to multiple ramps and trucked, if possible.
I had read Memphis only has something like 4 salt trucks and 6 snow plows for the entire city. A little foresight could have had some volume moving rather than virtually none.