Canceled runs only to be ran both ways by contractors

  • Thread starter Anonymous Brown Clown
  • Start date
A

Anonymous Brown Clown

Guest
Is this happening anywhere else? They started new jobs, two mileage runs and one that double trips meeting them both. However they either claim the second leg is canceled or both legs only to have contractors show up inbounding the loads at the rail yard and leaving with the return volume.
 
Top