Well here we go again, summertime blues. The endless time lost trying to find space #? for some snowbirds in an RV park, or the other big hit, lost time waiting in a road construction line.
Starting today, I'm looking at a 19 mile long project, where I have to connect with my load 12 miles into it. The word on the street as it is, suggests 15 to 30 minute delays each way. Oh boy, am I excited! Anyhow, to the point, any out there on how to sheet these? I'm still DIAD III, but think the software is the same to the IV model. Fish around as hard as I can, I don't see any option that jumps out at me.
Starting today, I'm looking at a 19 mile long project, where I have to connect with my load 12 miles into it. The word on the street as it is, suggests 15 to 30 minute delays each way. Oh boy, am I excited! Anyhow, to the point, any out there on how to sheet these? I'm still DIAD III, but think the software is the same to the IV model. Fish around as hard as I can, I don't see any option that jumps out at me.