SunnyBro
Member
We recently got a new manager in the building who has been trying to heavily push numbers with disregard to us. Sending people home, staffing us as low as possible, people not demanding their 3.5, and all that.
Recently she's staggered us by 10 minutes, meaning that if our start time is 6 pm we're only on the clock at 6:10 pm. The thing is that only the loaders in the building have been staggered. The pickoff, unload, and everyone else are not staggered and start work at 6 pm. She's intentionally delaying the loader's start time by 10 minutes to let the flow build up and take time away from us. I understand why she's doing it from a numbers perspective, but something about that feels wrong. Is this some sort of contract or rights violation or is she allowed to do this?
Recently she's staggered us by 10 minutes, meaning that if our start time is 6 pm we're only on the clock at 6:10 pm. The thing is that only the loaders in the building have been staggered. The pickoff, unload, and everyone else are not staggered and start work at 6 pm. She's intentionally delaying the loader's start time by 10 minutes to let the flow build up and take time away from us. I understand why she's doing it from a numbers perspective, but something about that feels wrong. Is this some sort of contract or rights violation or is she allowed to do this?