UpstateNYUPSer(Ret)
Well-Known Member
We dont even have enough volume to keep all our FT drivers working. Our bottom 5 seniority drivers work about 2 days a week. In order to work 70 hrs a week that would mean that the volume in our center would have to double. Even during Peak there's no way we would work over 60 hrs a week with our volume.
It's not as though we are going to immediately go to 70 hour weeks or a 6 day work schedule upon contract ratification. The Company simply wants to have either (or both) of these options available to them in case they are needed within the next 5 years.