sadmanhere
Well-Known Member
we are in a co location .....OP, are you in a collocation or standalone HD terminal?
I'm still Still standalone HD, covering the same g.damn. area...
should at least split my area in half and have a ground truck doing one side, while I cover the other side. That way, I can cut my miles in half
This stuff was talked about in another thread...
I already cluster my neighborhoods and run it out of VRP sequence, hope Vision numbers are similar.
split the miles in half sounds great...but fedex is going to act like the work is going to be half as easy and really low ball us in the next contracts
and what about monday to saturday? what is the drivers schedule going to look like? how many are going to work 6 days ? one maybe? but for how long? scheduling drivers on a route for 6 days is going to be rough....we are going to have to rotate everyone days off and have a rotating driver......